CASE STUDY 4

LOCATION:

Liverpool

COMPANY:

South Liverpool Housing

PROJECT TYPE:

Total Waste Management Service
For further information please contact:
Mr Robert Tinsley
0151 423 5928
rtinsley@wsrrecycling.co.uk

Brief / Objective

WSR Recycling Ltd were appointed by Seaway Heavy Lifting (SHL) to provide ‘Total Waste Management’ services to Seaway Heavy Lifting Engineering BV (SHL) of the Netherlands as part of the Gwynt Y Mor Offshore Windfarm Project.

The €2billion Gwynt Y Mor project was constructed by RWE NPowerand consisted of 160 turbines generating 576MW of electricity, enough to feed 400,000 homes.

Activities & Services Overview

The main activities of this work included:

WSR has worked with South Liverpool Housing (SLH) for several years providing waste management solutions. As well as providing skips and tipping services WSR was asked to help clear an overgrown garden that was landlocked. WSR operate a wide range of plant including dozers, dumpers and excavators from 1.5 tonne to 36 tonne so this was not a problem.WSR provided an 8tonne excavator complete with handling grab for this particular project.

This type of machine has rubber tracks which enabled WSR to protect the driveway. WSR were able to access the material over a 2m wall keeping the properties fully intact. Atotal of31 Tons was removed and this material was diverted from landfill:

  • Soils and rubble were recycled into aggregates.
  • Green waste, bushes and trees where recycled into compost
  • Wood , metals, plastics were recycledAny residual material was shredded and converted into fuel (Energy From Waste)

WSR were pleased to be able to assist SLH and look forward to working with them in the future.

All works were completed within the allotted timeframe andto the satisfaction of the client.

CASE STUDY 3

LOCATION:

Gwynt Y Mor

COMPANY:

Seaway Heavy Lifting (SHL)

PROJECT TYPE:

Total Waste Management Service
For further information please contact:
Mr Robert Tinsley
0151 423 5928
rtinsley@wsrrecycling.co.uk

Brief / Objective

WSR Recycling Ltd were appointed by Seaway Heavy Lifting (SHL) to provide ‘Total Waste Management’ services to Seaway Heavy Lifting Engineering BV (SHL) of the Netherlands as part of the Gwynt Y Mor Offshore Windfarm Project.

The €2billion Gwynt Y Mor project was constructed by RWE NPowerand consisted of 160 turbines generating 576MW of electricity, enough to feed 400,000 homes. The project is currently the largest windfarm project under construction in Europe and is due to be fully operational at the end of 2014.

Activities & Services Overview

The main activities of this work included:

SHL is supported the whole operation through the provision of their purpose built vessel, the Stanislav Yudin, which is transporting and laying all the foundations for the 160 turbines.

WSR were approached by SHL to help support them in the design and implementation of the statutory required Site Waste Management Plan (SWMP) for approval by the principal contractor along with the appropriate safety method statements for all the required operations.

Waste materials currently generated by all the offshore activities of SHL were transported to the Gwynt Y Mor Base Harbour Port Facility at Birkenhead. In line with the requirements of the SWMP waste was segregated into polypropylene bulk bags covering waste groups like plastic, food, general waste and hazardous waste such as oily rags, paints, absorbent granules. In addition, wooden pallets and used foundation grout was also brought onshore from the SHL vessel.

WSR trained operatives remove all the waste materials from SHL shipping containers and placed into WSR containers (via telehandler) prior to haulage to our Ditton Road waste management facility. Accurate reporting was provided through our integrated weighbridge software aids in the production of accurate figures for the SWMP and to providedour customer with information on how much material is re-used, recycled or disposed to meet the requirements of the waste hierarchy.

All works were completed within the allotted timeframe andto the satisfaction of the client.

CASE STUDY 2

LOCATION:

Daresbury

COMPANY:

Viridor Waste Management

PROJECT TYPE:

Waste Clean Up & Disposal
For further information please contact:
Mr Thomas Ward
0151 423 5928
tward@wsrrecycling.co.uk

Brief / Objective

WSR Recycling Ltd were appointed by Viridor Waste Management to provide a collection and disposal waste service for the Creamfields event in Daresbury in the Summer of 2014.

Activities & Services Overview

The main activities of this work included:
  • On the August bank holiday weekend there was one of the largest open air music festivals in the UK, Creamfields, whichplayed host to thousands of music lovers.
  • Music lovers camped out over the weekend to enjoy all the fun and soak up the atmosphere of thefestival.
  • When the festival was over it was clean up time –time to move the tents, wellies, sleeping bags, clothes and camping equipment during a massive 14 day clean-upoperation.
  • WSR Recycling Limited (www.wsrrecycling.co.uk) teamed up with Viridor (www.viridor.co.uk) to process and treat all waste produced at the festival.
  • The task was completed and success all round, a great weekend for Creamfield fans and the area cleared in a sociably responsible way.
All works were completed within the allotted timeframe andto the satisfaction of the client.

CASE STUDY 1

LOCATION:

Jaguar, Halewood

COMPANY:

ThyssenKrupp Services Ltd

PROJECT TYPE:

Waste Clean Up & Disposal
For further information please contact:
Mr Robert Tinsley
07899 026901
rtinsley@wsrrecycling.co.uk

Brief / Objective

WSR Recycling Ltd were appointed by ThyssenKrupp Services Ltd to provide bespokewaste management services in relation to their facilities management role at the Jaguar LandRover Plant in Halewood. The main objective of this project was to clear all waste materials located in the trailer park at the plant. Waste material located in this area was a consequence of wind-blown material from across the site coupled with wastes tipped from lorry drivers sourced from their cabins and waste material left in the trailers.

Activities & Services Overview

The main activities of this work included:
  • Waste mechanically stripped from the between the boundary fence and trip wall;
  • Waste collected in the bucket of the backhoe excavator and transferred to the onsite waste collection skips;
  • Manualcollection of residual waste not removed mechanicallyor trapped in the fence mesh/vegetation;
  • Placementof clean/inert fill materials in the area were all waste had been previously stripped.
All works were completed within the allotted timeframe andto the satisfaction of the client.